Request a Stand Proposal →

Medical Exhibition Stand Builder

VAV Grup is a medical exhibition stand builder: we design, produce and install custom stands for medical, dental, laboratory and health-IT trade fairs such as MEDICA in Düsseldorf, WHX Dubai (formerly Arab Health), IDS in Cologne and HIMSS in Chicago. Stands are made in our own workshop in İkitelli OSB, Istanbul, and one project manager handles design, venue approval drawings, production, transport, build-up and dismantling.

Medical exhibition stand builder for MEDICA, WHX Dubai, IDS and HIMSS

Short answer: send us the fair, hall and stand number, stand size, open sides and the list of devices you want to show. We prepare a 3D design and the technical drawings the organiser and venue must approve, produce the stand in our own workshop in İkitelli OSB, Istanbul, and build it on site. For European shows we stage stands from our Düsseldorf warehouse with build crews coordinated from our Hannover base; Gulf shows are installed with our contracted partner in Sharjah. We are an independent contractor hired by exhibitors, not an organiser's official contractor.

2026–2027 medical trade fairs: official dates and stand-planning points

FairOfficial datesVenueWhat to plan for (official source)
MEDICA 202616–19 November 2026Messe DüsseldorfStand construction 10 November 07:30 to 15 November 22:00 for the principal halls listed by the organiser; Hall 9 closed for renovation; two-storey stand plans due six weeks before build-up (Messe Düsseldorf Technical Guidelines). [1]
WHX Dubai 2027 (formerly Arab Health)25–28 January 2027Dubai Exhibition Centre (Expo City Dubai) and Dubai World Trade CentreTwo venues: contractor registration, deliveries and build-up are handled per venue, so confirm your venue and hall first. [2]
IDS 2027 (dental)16–20 March 2027Koelnmesse, CologneBuild-up 9–15 March 2027 (complete by 20:00 on 15 March); dismantling 20–23 March 2027. Koelnmesse: the official stand height for each event is in the registration forms; anything higher needs Koelnmesse approval. [3]
HIMSS 2027 (health IT)5–8 April 2027 (exhibition 6–8 April)McCormick Place, ChicagoMove-in times and height rules are in the organiser's exhibitor manual; check them before the design is frozen. [4]

What a medical stand needs that other stands do not

  • Live device demonstrations: for each device we need the model, dimensions, weight, operating mode, power and data load, heat or ventilation needs and the visitor clearance around it, before cabinetry and graphics are drawn.
  • Lockable device and sample storage that staff can reach without interrupting meetings.
  • Separate zones for public demonstrations, scheduled buyer meetings and staff work areas.
  • Regulatory copy (claims, approvals, indications) built into the graphics schedule, with an internal approval date before print.
  • Venue documents (stand drawings, material certificates, two-storey or rigging applications) prepared against the confirmed hall manual, not a generic venue assumption.

Brief checklist for a medical exhibition stand

  1. Fair, hall, stand number, floor plan, open sides and stand type
  2. Devices with dimensions, weights and demonstration method
  3. Power, network, ventilation and other technical loads
  4. Meeting capacity, lockable storage and staff area
  5. Brand assets, regulatory copy and your internal approval deadline

Related pages: exhibition stand builder Düsseldorf · healthcare stand builder in Germany · double-deck stands and venue rules · exhibition stand builder Cologne

Sources: [1] MEDICA – at a glance (Messe Düsseldorf); [2] WHX Dubai official event page and exhibitor FAQs; [3] IDS set-up and dismantling times 2027; [4] HIMSS27 official site. Checked 13 November 2026.

Stand Design & Aesthetics

Designs focus on bright, clinical, and high-tech environments using white and clinical blue/cyan color palettes. Glossy materials, clean lines, and soft integrated LED lighting are paired with private discussion lounges.

Typical Exhibition Requirements

  • ✓

    Clean, high-quality glossy finishes and dust-free product showcase environments.

  • ✓

    Stabilized power supply and clean cable management for delicate medical equipment.

  • ✓

    Spacious presentation areas, demo pods, and interactive display screens.

  • ✓

    Private meeting rooms for healthcare buyers, hospital directors, and distributors.

Upcoming Medical & Healthcare Exhibitions

2026-10-06

CPHI Milan 2026

Fiera Milano

Stand Solutions
2026-11-16

MEDICA 2026

Messe Düsseldorf

Stand Solutions
2027-01-25

WHX Dubai 2027 (Arab Health)

Dubai Exhibition Centre (Expo City Dubai) & Dubai World Trade Centre

Stand Solutions
2027-03-16

IDS 2027

Koelnmesse, Messegelände Köln-Deutz

Stand Solutions

Markets we cover for this sector

Frequently Asked Questions

VAV Grup designs, produces and installs custom stands for medical, dental, laboratory and health-IT fairs. We are an independent contractor hired directly by exhibitors, not the organiser's official contractor. Stands are made in our own workshop in İkitelli OSB, Istanbul; European shows are staged from our Düsseldorf warehouse and Gulf shows are installed with our contracted partner in Sharjah.
Messe Düsseldorf's Technical Guidelines require two-storey stand plans six weeks before build-up. For MEDICA 2026 the organiser lists stand construction from 10 November 07:30 to 15 November 22:00 for the principal halls.
Each device's model, dimensions, weight, operating mode, power and data load, heat or ventilation needs, consumables, operator position and the visitor clearance it needs. The current organiser rules for the confirmed hall still apply.
Yes. The organiser states that Arab Health has evolved into World Health Expo (WHX) Dubai. The 2027 edition runs 25–28 January 2027 at Dubai Exhibition Centre (Expo City Dubai) and Dubai World Trade Centre.
Koelnmesse's technical guidelines say the official stand height for each event is given in the registration forms, and constructions above it need Koelnmesse approval. IDS 2027 build-up runs 9–15 March 2027.
Power and network routes are planned with the device list, usually under a raised floor with accessible cable channels so wiring stays hidden and reachable, subject to the hall's technical rules.
Send the fair, hall and stand number, stand size, open sides and your device list through the form on this page or on WhatsApp at +90 532 457 67 78. We reply with a 3D design proposal and quotation.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request
Technical support

Global Exhibition Stand Design & Build Locations

We provide turnkey exhibition stand design, production, and installation services at major trade show venues worldwide. Explore our country and venue guides for your target destination.

CallWhatsAppGet Quote