Request a Stand Proposal →
Construction & Infrastructure

ISH 2027 stand builder and hall plan guide for Frankfurt

Frankfurt Exhibition Centre (Messe Frankfurt) • Frankfurt, Germany

What should exhibitors know about stand building at ISH 2027?

ISH 2027 runs from 15 to 19 March 2027 at Messe Frankfurt, and the organiser's September 2026 fairground plan lists the occupied halls. Stands above 100 m² or 4 metres need plans six weeks before set-up. Exhibition Stand Pro designs, produces and installs custom stands for building-technology exhibitors.

Show
ISH 2027
Venue
Frankfurt Exhibition Centre (Messe Frankfurt)
City
Frankfurt, Germany
Dates
15 March 2027 - 19 March 2027
Sector
Construction & Infrastructure
Proposal
Project-specific scope and quotation

Venue

Frankfurt Exhibition Centre (Messe Frankfurt)

Date Range

15 March 2027 - 19 March 2027

Sector

Construction & Infrastructure

ISH 2027 at a glance

ISH 2027 opens on Monday 15 March and closes on Friday 19 March in Frankfurt am Main, organised by Messe Frankfurt Exhibition GmbH. Opening hours are 09:00 to 18:00 from Monday to Thursday and 09:00 to 17:00 on Friday. The organiser's fairground plan, status September 2026, shows Halls 1, 2.0, 3.0, 3.1, 4.0, 4.1, 4.2, 5.0, 5.1, 8.0, 9.0, 9.1, 10.1, 11.0, 11.1, 12.0 and 12.1, plus the Forum, the Festhalle and Foyer 5.1/6.1. Hall 6 is marked as not occupied because of modernisation work.

Fairground plan and getting there

Open the organiser's fairground plan, a PDF that is subject to change. It shows the entrances (Agora, Torhaus, Galleria, Portalhaus, Europa-Allee and Congress Center) and the topics by hall: heat generation in Halls 9.1, 10.1, 11.0, 12.0 and 12.1, indoor air in 8.0 and 10.1, and bathrooms in 2.0, 3.0, 3.1, 4.1 and 4.2 plus the Forum.

From Frankfurt Airport, take the S8 or S9 to the central station and change to the S3, S4, S5 or S6 for "Frankfurt Messe", the stop for the Torhaus entrance. From the central station, the U4 reaches Festhalle/Messe after one stop. Exhibitors book a parking permit in advance in the organiser's exhibitor shop.

Set-up and dismantling

Advanced set-up can be ordered free of charge in the Shop for Exhibitor Services for 2 to 9 March 2027, from 07:00 to midnight; Halls 12.0 and 12.1 start on 27 February. Regular set-up begins on 10 March at 07:00 and ends on Sunday 14 March at 15:00, when the aisles must be clear so the carpet can be laid. On the last fair day, 19 March, dismantling starts at 17:00 and is limited to the inside of the stands. Regular dismantling runs from 20 to 22 March, and extended dismantling on 23 and 24 March can be ordered there too.

Plans, heights and two-storey stands

Messe Frankfurt's Technical Guidelines, as of September 2025, set the approval routine. A stand of up to 100 m² and up to 4.00 metres high that is not a special construction needs no permit. Plans are required above 100 m², for outdoor stands and for special constructions, which include structures or exhibits over 4 metres; they must reach the organiser as a PDF at least six weeks before set-up. Heights are set hall by hall in the organiser's fact sheet on construction heights.

A two-storey stand needs the consent of Technical Event Management, requested six weeks before set-up, and the interior must be at least 2.30 metres clear. Two-storey structures cannot be built in Hall 5.0. Materials must be at least B1 flame-retardant, and plastic cable ties may not secure static loads.

Organiser and venue facts

ISH 2027: key facts for exhibitors

Official dates

15–19 March 2027

Venue

Messe Frankfurt, Frankfurt am Main

Opening hours

09:00–18:00 Monday to Thursday; 09:00–17:00 Friday

Organiser

Messe Frankfurt Exhibition GmbH

Advanced set-up

2–9 March 2027, 07:00 to midnight; Halls 12.0 and 12.1 from 27 February; ordered free of charge in the Shop for Exhibitor Services

Regular set-up

10 March at 07:00 to Sunday 14 March at 15:00

Dismantling

19 March from 17:00 (inside the stands only); regular 20–22 March; extended 23–24 March

Plans required

Above 100 m², outdoor stands and special constructions, including structures or exhibits over 4 metres; PDF at least six weeks before set-up

Hall 6

Marked as not occupied because of modernisation work (fairground plan, status September 2026)

Stand planning priorities

  • ◆A stand of up to 100 m² and up to 4.00 metres high that is not a special construction needs no permit.
  • ◆A two-storey stand needs the consent of Technical Event Management, requested six weeks before set-up, and the interior must be at least 2.30 metres clear.
  • ◆Two-storey structures cannot be built in Hall 5.0.
  • ◆Materials must be at least B1 flame-retardant, and plastic cable ties may not secure static loads.
  • ◆On the last fair day, 19 March, dismantling starts at 17:00 and is limited to the inside of the stands.

Send this for a buildable proposal

  • ✓Hall and stand number
  • ✓Size and open sides

How we build for ISH

Bathroom ranges, heating systems and building software show best when they look installed, so we plan wall fixings, floor build-ups and lighting before production starts. Our own crews fit, in the hall, what comes out of our 6,000 m² production facility. Our work covers Türkiye, the Middle East, the USA, Canada and Europe. See our exhibition stand construction service for how a build is organised.

Request an ISH concept and quote

Give us your hall and stand number with the size and open sides, and we will look up your hall's height limit before anything is sketched. A first concept and quote carry no fee. Write to us.

Direct stand manufacturingInternational transport planningCoordinated local installation teamsVenue-document coordination

VAV Grup by the Numbers

6,000 m²

Production facility, Ikitelli OSB, Istanbul

Hannover

Local base: storage, quality checks, on-site support

Independent

Stand contractor working to organiser rules

Frequently Asked Questions

On the organiser's fairground plan, a PDF with status September 2026. The interactive plan linked from the site still showed 2025 when we checked.
No. The September 2026 fairground plan marks Hall 6 as not occupied because of modernisation work.
Advanced set-up can be ordered for 2 to 9 March, and from 27 February in Halls 12.0 and 12.1. Regular set-up starts on 10 March at 07:00.
At least six weeks before set-up, as a PDF, for stands above 100 m², outdoor stands and special constructions such as structures over 4 metres. Two-storey stands also need consent requested six weeks ahead.
Yes, with consent from Technical Event Management, which can refuse a request at its own discretion. It is not possible in Hall 5.0, and the organiser invoices the authorisation after the show.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request
Technical support

Global Exhibition Stand Design & Build Locations

We provide turnkey exhibition stand design, production, and installation services at major trade show venues worldwide. Explore our local operations in your target destination.

CallWhatsAppGet Quote