Short answer: An exhibitor-appointed contractor (EAC) is any outside company you hire to work on your booth on the show floor instead of the show’s official general service contractor (such as Freeman or GES) — typically your booth builder, installation and dismantle (I&D) crew, AV or furniture supplier. Shows that allow EACs expect you to notify show management by a deadline set in the exhibitor manual (the ASTRO 2026 symposium set it 28 days before opening), your EAC to send a certificate of insurance naming the required parties, and your EAC to follow the show’s labor rules. Check the manual for services that stay with the official contractor.
Updated 25 October 2026. The figures below are quoted from published show manuals and are examples only — the binding rules are always the ones in your own show’s exhibitor service manual.
How shows define an EAC
The wording differs from show to show. Two examples:
- Coverings 2027 (tile and stone, 6–9 April 2027, Orange County Convention Center, Orlando) defines an EAC as “a subcontractor, other than the General Services Contractor (Freeman), selected by an exhibitor” for a nonexclusive service that needs hall access during move-in, show days or move-out — booth design, installation, dismantling, furniture, floral or audiovisual work, and anyone working in the booth who is not a direct employee of the exhibiting company. (Coverings EAC resources)
- Game Developers Conference 2022 (Moscone Center, San Francisco) described EAC work as “supervising, inspecting, building, and/or installing & dismantling booth properties/displays”, and required registration through the Exhibitor Appointed Contractors Association (EACA). (GES EAC form, GDC)
In practice: if a company that is not on your payroll will touch your booth inside the hall, it is an EAC and must be registered.
Step by step: using your own booth builder at a US show
- Download the exhibitor service manual as soon as you book space. Find the EAC section, the labor/work rules and the booth display rules (height, island and peninsula rules).
- Submit the EAC notification form before the deadline. Examples: the ASTRO 2026 symposium (16–18 February 2026) set 19 January 2026 — 28 days before opening (ASTRO EAC policies); GDC 2022 set one deadline, 11 February 2022, for both the EAC registration and the insurance certificate.
- Your EAC sends the certificate of insurance (COI) to show management by the same deadline, naming the required additional insureds.
- Confirm the labor rules for the venue. In some cities EAC crews must hire union labor; in right-to-work states exhibitors often have more freedom. The GDC 2022 manual told EACs to hire union personnel, and noted that EAC labor is billed from the moment workers arrive on site. Our city guides summarise the venue rules for Chicago (McCormick Place), Las Vegas, Orlando, New York (Javits) and Atlanta (GWCC).
- Order the exclusive services separately. Your manual lists services reserved for official or venue contractors; at IPPE in Atlanta, for example, dock unloading, rigging and booth cleaning stayed with the official contractor (see our Atlanta guide). Budget for these on top of the booth.
- Badges on site. EAC workers wear show-issued contractor badges at all times (a GDC 2022 requirement).
Insurance: what a typical certificate looks like
Two published examples of EAC insurance requirements:
| Coverage | ASTRO 2026 symposium | GDC 2022 (Moscone Center) |
|---|---|---|
| General liability, each occurrence | $1,000,000 | $1,000,000 |
| General aggregate | $2,000,000 | $2,000,000 |
| Products / completed operations aggregate | $2,000,000 | $2,000,000 |
| Umbrella / excess | $1,000,000 occurrence / $1,000,000 aggregate | $1,000,000 occurrence / $1,000,000 aggregate |
| Workers’ compensation & employers’ liability | $1,000,000 each accident / disease limits | $1,000,000 each accident / disease limits |
| Automobile liability | $1,000,000 combined single limit (required even without a vehicle on site) | Not less than $1,000,000 |
ASTRO also required a waiver of subrogation and 30 days’ notice before any cancellation, and listed show management, the venue hotel and every exhibitor the contractor represents as additional insureds. Ask your booth builder for its COI before you sign — a builder who cannot produce one cannot work your booth.
What stays with the official contractor
It depends on the show and the venue. At IPPE in the Georgia World Congress Center, for example, exhibitors could install and dismantle with an EAC or their own staff, while unloading at the docks, rigging and booth cleaning stayed with the official contractor (see our Atlanta guide). Find the list for your show in the exhibitor manual before you budget.
Deadline checklist
| Task | Where the date comes from |
|---|---|
| Booth size and type (inline 10×10 / 10×20, peninsula, island) and display rules | Space contract and booth display rules |
| EAC notification form | EAC section of the manual (ASTRO 2026: 28 days before opening) |
| Certificate of insurance | Same deadline as the EAC form at GDC 2022 |
| Material handling, electrical, rigging orders | Official contractor’s ordering portal |
| Shipping the booth | Work back from the move-in date in the manual, allowing for transit and customs |
Working with VAV Grup as your EAC
VAV Grup İnovasyon İnşaat Mimarlık Ltd. Şti. designs and builds custom booths in its own production facility in İkitelli OSB, Istanbul, ships them to the US and plans installation as your EAC wherever the show allows it, and each project is scoped against that show’s EAC and labor rules. We do not have a US office; every project is scoped against the specific show manual. This suits exhibitors from Türkiye and Europe who want to reuse one booth design at several shows — see our USA trade show booth page.
Send us your show name, booth number and size through the form on this page, or message us on WhatsApp — we reply with a design concept and an itemised quote that separates our scope from the official-contractor services you order yourself.
FAQ
Is an EAC the same as an I&D company? An I&D (installation and dismantle) company is one kind of EAC. Your booth builder, AV company or florist can also be EACs — the term covers any non-official contractor working in the hall.
What happens if I miss the EAC deadline? The manuals quoted above do not spell this out, so ask show management immediately. Treat the EAC form and the insurance certificate as one deadline.
Do I need a US company to be my EAC? None of the manuals quoted here asks for a US address; they ask for registration, insurance and compliance with labor rules. Check your own manual.
Where do I find my show’s EAC rules? In the exhibitor service manual from the show’s general service contractor (often on an ordering portal such as Freeman or GES), usually under “Exhibitor Appointed Contractors” or “EAC”.