Short answer: Romexpo in Bucharest caps stands at 5 m in halls A and C1–C6 and 7 m in pavilions B1 and B2, starting from a 2.50 m standard that needs written consent to exceed. Every stand project needs Romexpo's approval first, and two-level stands need the fire service's approval too. VAV Grup designs and builds custom stands for Romexpo fairs from its production facility in İkitelli OSB, Istanbul.
The rules below come from Romexpo’s General, Technical and Participation Conditions (updated 15 January 2025) and its 2025 fair forms. The 2027 forms were not yet published when we checked, so confirm them for your own fair.
Romexpo at a glance
| Item | Romexpo, Bucharest |
|---|---|
| Address | Bd. Mărăști 65–67, sector 1, Bucharest |
| Pavilion B1 | Exhibition area 11,750 m²; 10.56 m under the beams; 14.17 m overall; 4 freight doors |
| Pavilion B2 | Exhibition area 15,222 m²; 10.56 m under the beams; 14.17 m overall; 4 cargo doors |
| Pavilion B3 | Links B1 and B2: access hall of 1,420 m² plus conference rooms |
| Pavilion A (Central) | Four levels under a 34 m dome; Romexpo lists 15,247 m² gross on one page and 17,250 m² on another |
| Floor load | 5,000 kg/m² in B1 and B2; 3,500 kg/m² in A and C1–C6; 300 kg/m² on upper floors |
| Outdoor bearing capacity | 500 kg/m² |
| Power | 230 V single-phase and 400 V three-phase, 50 Hz |
| Venue phone | +40 21 207 70 00 |
Romexpo’s own pages give different totals: 46,000 m² indoors on one page, and 44,973 m² indoors plus 12,353 m² outdoors in its 2025 Activity Report. We use the per-pavilion figures above for design. Airport distance is not published on the venue’s pages.
Romexpo stand rules in one table
| Topic | Romexpo’s rule |
|---|---|
| Standard height | 2.50 m for stands and billboards; higher needs written consent |
| Maximum height | 5 m in halls A and C1–C6; 7 m in B1 and B2 |
| Two-level stands | Only in A, C1, C3, C4, C5, C6, B1 and B2; prior approval from the fire service and Romexpo |
| Level height | Interior height of each level at least 2.40 m |
| Upper-floor load | 3.0 kN/m² for meetings; 5.0 kN/m² for exhibits or sales |
| Stairs | One staircase up to 100 m² upper level, two above; no spiral stairs |
| Upper ceiling | At least 70% open |
| Setbacks | Stairs and terraces at least 1.00 m from aisle edges and 3.00 m from neighbours |
| Fire | Highly flammable materials banned; fireproofing certificates presented at set-up; at least one extinguisher per stand |
| Exits | Stands over 100 m² need two exits |
| Vehicles | No vehicle access inside pavilions; loading in logistics areas |
| Project files | JPG, PDF or AutoCAD 2005–2007 |
Which pavilion suits a tall or two-level stand
The pavilion decides what you can build, so check it before design starts. B1 and B2 give the extra 2 m of height, the highest floor load and suspension points, which makes them the natural fit for machinery, tall brand towers and heavier exhibits. Halls A and C1–C6 stop at 5 m and the Conditions we read bar ceiling anchorage there, so plan a freestanding structure unless Romexpo confirms otherwise.
Pavilion C2 does not appear in the list of halls allowing two levels in the Conditions we read. If your fair places you there, ask Romexpo before planning a second level.
Romexpo’s calendar names pavilions for only eight 2027 listings, and the five fairs below with a published pavilion all sit in B2. For later fairs, ask the organiser which pavilion you are in before you approve a concept.
Approval: what to send and when
- Fair form: the third-party stand form names the specialised company building your stand.
- Project file: drawings go to Romexpo in an accepted format. The deadline is set per fair: 16 August 2025 for RomMedica 2025 and 5 September 2025 for Indagra Food 2025. Those are past examples, not 2027 dates.
- Two-level file: extra lead time for the fire service approval.
- Certificates: fireproofing certificates ready at set-up.
- Start on site: only after Romexpo’s approval.
Romexpo’s approval does not cover structural strength, so your stand builder must carry that responsibility. Romexpo’s 2025 forms also listed a registration fee of EUR 200 and fees for rented standard stands, all excluding VAT. Check the 2027 form for your fair.
Fair calendar at Romexpo, 2027
| Fair | Sector | Dates 2027 | Pavilion |
|---|---|---|---|
| Food Service & Hospitality | Foodservice, hospitality | 3–5 Apr | Not published |
| Construct Ambient Expo | Construction | 15–18 Apr | B2 |
| Romtherm | HVAC | 15–18 Apr | B2 |
| Mobila Expo | Furniture | 15–18 Apr | B2 |
| Digital Metal & TIB | Metalworking, industry | 11–14 May | B2 |
| Expo Petro Gaz | Oil and gas | 11–14 May | B2 |
| Pack Show | Packaging | 11–14 May | Not published |
| BIFE-SIM | Furniture | 16–19 Sep | Not published |
| Rommedica | Medical | 1–3 Oct | Not published |
| All2Print | 12–15 Oct | Not published | |
| Indagra and Indagra Food | Agriculture, food | 27–31 Oct | Not published |
Dates from Romexpo’s official Exhibition Program 2027 and calendar, checked November 2026. Confirm on the organiser’s site before booking.
How we deliver a stand to Bucharest
- Brief and design: send the fair, pavilion, stand number and size. We reply with a first design and a project-specific quotation.
- Approval package: drawings and certificates prepared for Romexpo’s review.
- Production: the stand is built and pre-assembled at our facility in İkitelli OSB, Istanbul.
- Shipping: road freight to Romania with an A.TR certificate for stand materials.
- Build-up and dismantling: our crew works inside the fair’s window.
- After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show.
We are an independent stand contractor, not an official supplier of Romexpo or any organiser.
Related pages
- Exhibition stand builders in Romania
- Double-deck exhibition stands: rules and planning
- How to choose an exhibition stand contractor
- How much does an exhibition stand cost in Europe?
- Request a quote