Exhibition Stand Builders Bucharest: Romexpo Rules 2027

•By Exhibition Stand Pro Team

Short answer: Romexpo in Bucharest caps stands at 5 m in halls A and C1–C6 and 7 m in pavilions B1 and B2, starting from a 2.50 m standard that needs written consent to exceed. Every stand project needs Romexpo's approval first, and two-level stands need the fire service's approval too. VAV Grup designs and builds custom stands for Romexpo fairs from its production facility in İkitelli OSB, Istanbul.

The rules below come from Romexpo’s General, Technical and Participation Conditions (updated 15 January 2025) and its 2025 fair forms. The 2027 forms were not yet published when we checked, so confirm them for your own fair.

Romexpo at a glance

Item Romexpo, Bucharest
Address Bd. Mărăști 65–67, sector 1, Bucharest
Pavilion B1 Exhibition area 11,750 m²; 10.56 m under the beams; 14.17 m overall; 4 freight doors
Pavilion B2 Exhibition area 15,222 m²; 10.56 m under the beams; 14.17 m overall; 4 cargo doors
Pavilion B3 Links B1 and B2: access hall of 1,420 m² plus conference rooms
Pavilion A (Central) Four levels under a 34 m dome; Romexpo lists 15,247 m² gross on one page and 17,250 m² on another
Floor load 5,000 kg/m² in B1 and B2; 3,500 kg/m² in A and C1–C6; 300 kg/m² on upper floors
Outdoor bearing capacity 500 kg/m²
Power 230 V single-phase and 400 V three-phase, 50 Hz
Venue phone +40 21 207 70 00

Romexpo’s own pages give different totals: 46,000 m² indoors on one page, and 44,973 m² indoors plus 12,353 m² outdoors in its 2025 Activity Report. We use the per-pavilion figures above for design. Airport distance is not published on the venue’s pages.

Romexpo stand rules in one table

Topic Romexpo’s rule
Standard height 2.50 m for stands and billboards; higher needs written consent
Maximum height 5 m in halls A and C1–C6; 7 m in B1 and B2
Two-level stands Only in A, C1, C3, C4, C5, C6, B1 and B2; prior approval from the fire service and Romexpo
Level height Interior height of each level at least 2.40 m
Upper-floor load 3.0 kN/m² for meetings; 5.0 kN/m² for exhibits or sales
Stairs One staircase up to 100 m² upper level, two above; no spiral stairs
Upper ceiling At least 70% open
Setbacks Stairs and terraces at least 1.00 m from aisle edges and 3.00 m from neighbours
Fire Highly flammable materials banned; fireproofing certificates presented at set-up; at least one extinguisher per stand
Exits Stands over 100 m² need two exits
Vehicles No vehicle access inside pavilions; loading in logistics areas
Project files JPG, PDF or AutoCAD 2005–2007

Which pavilion suits a tall or two-level stand

The pavilion decides what you can build, so check it before design starts. B1 and B2 give the extra 2 m of height, the highest floor load and suspension points, which makes them the natural fit for machinery, tall brand towers and heavier exhibits. Halls A and C1–C6 stop at 5 m and the Conditions we read bar ceiling anchorage there, so plan a freestanding structure unless Romexpo confirms otherwise.

Pavilion C2 does not appear in the list of halls allowing two levels in the Conditions we read. If your fair places you there, ask Romexpo before planning a second level.

Romexpo’s calendar names pavilions for only eight 2027 listings, and the five fairs below with a published pavilion all sit in B2. For later fairs, ask the organiser which pavilion you are in before you approve a concept.

Approval: what to send and when

  1. Fair form: the third-party stand form names the specialised company building your stand.
  2. Project file: drawings go to Romexpo in an accepted format. The deadline is set per fair: 16 August 2025 for RomMedica 2025 and 5 September 2025 for Indagra Food 2025. Those are past examples, not 2027 dates.
  3. Two-level file: extra lead time for the fire service approval.
  4. Certificates: fireproofing certificates ready at set-up.
  5. Start on site: only after Romexpo’s approval.

Romexpo’s approval does not cover structural strength, so your stand builder must carry that responsibility. Romexpo’s 2025 forms also listed a registration fee of EUR 200 and fees for rented standard stands, all excluding VAT. Check the 2027 form for your fair.

Fair calendar at Romexpo, 2027

Fair Sector Dates 2027 Pavilion
Food Service & Hospitality Foodservice, hospitality 3–5 Apr Not published
Construct Ambient Expo Construction 15–18 Apr B2
Romtherm HVAC 15–18 Apr B2
Mobila Expo Furniture 15–18 Apr B2
Digital Metal & TIB Metalworking, industry 11–14 May B2
Expo Petro Gaz Oil and gas 11–14 May B2
Pack Show Packaging 11–14 May Not published
BIFE-SIM Furniture 16–19 Sep Not published
Rommedica Medical 1–3 Oct Not published
All2Print Print 12–15 Oct Not published
Indagra and Indagra Food Agriculture, food 27–31 Oct Not published

Dates from Romexpo’s official Exhibition Program 2027 and calendar, checked November 2026. Confirm on the organiser’s site before booking.

How we deliver a stand to Bucharest

  1. Brief and design: send the fair, pavilion, stand number and size. We reply with a first design and a project-specific quotation.
  2. Approval package: drawings and certificates prepared for Romexpo’s review.
  3. Production: the stand is built and pre-assembled at our facility in İkitelli OSB, Istanbul.
  4. Shipping: road freight to Romania with an A.TR certificate for stand materials.
  5. Build-up and dismantling: our crew works inside the fair’s window.
  6. After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show.

We are an independent stand contractor, not an official supplier of Romexpo or any organiser.

Sources

Frequently asked questions

Romexpo's General, Technical and Participation Conditions set a standard height of 2.50 m. Higher stands need Romexpo's written consent, with a general maximum of 5 m in halls A and C1–C6 and 7 m in pavilions B1 and B2.
Two-level stands are allowed only in pavilions A, C1, C3, C4, C5, C6, B1 and B2, with prior approval from the fire service and Romexpo. Each level needs at least 2.40 m of interior height, and spiral stairs are not allowed.
Yes. Stand construction is allowed only after Romexpo S.A. approves the project, and stands by outside constructors need that approval too. Romexpo does not check structural strength, so that stays with the stand builder. Each fair sets its own project deadline.
The Conditions we read forbid ceiling anchorage of stand structures in halls A and C1–C6, though Pavilion A may have a separate engineer-approved route. Pavilions B1 and B2 allow suspension within published load limits. Confirm with Romexpo for your hall before design sign-off.
Unless a fair sets other times, set-up and dismantling run between 08:00 and 20:00. Extensions need written consent. Each fair publishes its own dates; none of the 2027 schedules was available in November 2026.
Romania is in the EU, and Türkiye and the EU are in a customs union for industrial goods, so stand materials made in Istanbul can travel with an A.TR movement certificate. Exhibits you take back home can use an ATA Carnet; consumables cannot.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request
Technical support