Short answer: embedded world 2027 is on 16–18 March 2027 at NürnbergMesse in halls 1, 2, 3, 3A, 4, 4A, 5 plus NCC Ost and NCC Mitte. Assembly runs 12–15 March, dismantling 18–20 March 2027. Your stand design must pass Booth+Check at least six weeks before the show (about early February 2027), and late service orders can cost up to 100% extra.
Exhibiting in Nuremberg? Request a stand quote or WhatsApp +90 532 457 67 78.
embedded world 2027 at a glance
| Item | embedded world 2027 (official) |
|---|---|
| Show days | 16–18 March 2027 |
| Venue | NürnbergMesse, Messezentrum 1, 90471 Nürnberg |
| Halls | 1, 2, 3, 3A, 4, 4A, 5, NCC Ost, NCC Mitte |
| Assembly | 12–15 March 2027 |
| Dismantling | 18–20 March 2027 |
| Stand approval | Booth+Check, ≥ 6 weeks before the show |
| Service orders | NürnbergMesse Shop; express surcharges up to 100% |
Sources: exhibitor information, floor plan.
Hall plan
The official plans are downloadable from the embedded world floor-plan page. There is no interactive map; the page offers PDF plans per hall. Check your hall’s plan for columns, ceiling height and hall gates before your designer starts — at the Nuremberg venue these vary from hall to hall.
Assembly and dismantling times
| Day | Hours |
|---|---|
| Fri 12 – Sun 14 March 2027 (assembly) | 07:00–24:00 |
| Mon 15 March 2027 (last assembly day) | 07:00–20:00 |
| Thu 18 March 2027 (dismantling starts) | 17:00–24:00 |
| Fri 19 March 2027 | 07:00–24:00 |
| Sat 20 March 2027 | 07:00–19:00 |
Important: stands not started by 15:00 on Monday 15 March may be built by the organiser at the exhibitor’s cost. Early set-up is approved only to a very limited extent. Source: exhibitor information.
Deadlines
- Booth+Check approval — no later than six weeks before the event (about 2 February 2027 by our count). Two-storey, large or special constructions need full drawings.
- Service orders (power, internet, water, rigging) in the NürnbergMesse Shop. The organiser says deadlines appear in the Shop in due course; late orders carry express surcharges of up to 100%.
- Regulations and suspension points — see plan your stand: regulations.
What embedded exhibitors need from a stand
Embedded and electronics exhibitors usually need demo counters with clean power, many monitors, secure storage for prototypes and a quiet meeting room. Plan cable routes and power per demo point early. Ideas: interactive technology for stands, design checklist.
Cost and logistics
Use our Germany cost per m² guide for budgeting. We pre-build every custom stand in our production facility in İkitelli OSB, Istanbul, truck it to Nuremberg and assemble with our own supervisors. Our Düsseldorf warehouse and Hannover base support German shows.
See also our embedded world Nuremberg show page, choosing a stand builder for German trade fairs and German exhibiting rules.
Get your embedded world 2027 quote: request a quote or WhatsApp +90 532 457 67 78.