Request a Stand Proposal →

Exhibition Stand Builder Gothenburg: Svenska Mässan Rules

•By Exhibition Stand Pro Team

Short answer: Svenska Mässan, the Swedish Exhibition & Congress Centre at Korsvägen in Gothenburg, sets a 2.5 m standard stand height, allows two-storey stands up to 5 m with written approval and limits ceiling points to 50 kg. All lifting and truck work in the halls is provided by the venue. VAV Grup designs and builds custom stands for Gothenburg fairs from its production facility in İkitelli OSB, Istanbul.

Rules below come from the venue’s Safety and Technical Regulations (ST_2025:01E) and exhibitor terms. Your fair’s own manual can add to them.

Svenska Mässan at a glance

Item Svenska Mässan, Gothenburg
Operator Svenska Mässan Gothia Towers AB
Visiting address Mässans Gata / Korsvägen, Gothenburg, Sweden
Total site 180,000 m² meeting place (official figure, not exhibition area only)
Exhibition space About 41,000 m² in 9 halls (Fair-Point listing)
Hall floor Mainly epoxy-treated concrete
Power AC 50 Hz, 230 V 1-phase and 400 V 3-phase
Venue phone +46 31 708 80 00

Stand rules in one table

Topic Rule
Standard maximum height 2.5 m for structures and graphics
Above 2.5 m Notify the adjacent stand and your event salesperson; six-week deadline
Two-storey approval Written approval from the Centre
Two-storey height Total construction height max 5 m; lower level free height 2.3–2.5 m
Upper level area Up to 50% of the lower floor space
Distance between two-level stands At least 10 m
Stairs Max 10 m walk from any part of level 2; 0.8 m stair up to 25 m², plus another 0.8 m stair per further 25 m² or part
Ceiling points Max 50 kg per fitting; position margin ±50 cm
Lighting ramps Hang at least 2.2 m from the floor
Wall orders Support walls around every four metres
Floor May not be painted or damaged; rubber mallets only on subfloors
Exhibitor insurance Billed with the stand by default, capped at SEK 300,000

The two rules that catch foreign stand builders

Truck work. Vehicles may not enter the halls, and the venue provides all lifting and truck work. Plan crate sizes and delivery slots around this, and budget it as a venue service in your quotation. It is the reason we ship a stand in labelled sections that can be set directly on the stand position.

The 50 kg ceiling limit. A large hanging banner or lighting truss can pass 50 kg quickly once you count the frame, fabric and motors. Spreading the load over several points adds fittings and cost, and wire positions can be 50 cm off, so a design that depends on exact hanging positions needs a tolerance. We check the hanging weight during design, not on site.

Fire and electrics

  • Materials: stand walls and ceilings must be type-approved and not more flammable than wood.
  • Ceiling textiles: the halls are sprinkler-fitted, so use woven netting or sprinkler fabric, impregnated to fireproof level.
  • Roofs: roofing over 30 m² requires consultation with the Fire Protection Officer, and closed-in constructions need smoke detectors connected to the fire alarm.
  • Hot work: needs authorisation and a holder of an approved Hot Work Licence.
  • Flammable goods: applications are due at the latest four weeks before the event, with an administrative fee of SEK 1,500.
  • Electrics: work follows ELSÄK-FS 2008:1 and SS 436 40 00, with at least 1 m clear in front of every distribution board. Connections above 63 A are made by the Centre’s designated staff.

Build-up and clearing out

Under the exhibitor terms, everything must be fully assembled by the evening before opening. The exhibitor arranges cleaning of its own stand, and no waste may be left in the walkways. All exhibits and waste must be removed straight after the fair; otherwise the venue may remove them at the exhibitor’s risk and cost. Anyone you hire must follow the same rules, and you stay liable for their work, so ask a contractor to confirm it has read ST_2025:01E.

2027 fair calendar in Gothenburg

Fair Dates
Clima Energy Nordic 2–4 Feb 2027
Navy Tech & Seabed Defence 2–4 Feb 2027
D-congress 10–11 Mar 2027
Safety Week 5–9 Apr 2027
Elfack 11–14 May 2027
Vitalis 25–27 May 2027
EAN Congress 12–15 Jun 2027
Vatten 12–14 Oct 2027
Scanpack 26–29 Oct 2027

Dates from the venue’s exhibitor service calendar, checked November 2026.

How we deliver a stand to Gothenburg

  1. Brief and design: you send the event, hall, stand number, size and deadline. We reply with a first design and a project-specific quotation.
  2. Approval package: drawings, two-storey approval request, hanging loads and fire documents prepared for the venue.
  3. Production: the stand is built and pre-assembled at our production facility in İkitelli OSB, Istanbul.
  4. Shipping: road freight to Sweden with an A.TR certificate for stand materials.
  5. Build-up and dismantling: our crew installs the stand in the organiser’s window and works with the venue’s lifting, rigging and power services.
  6. After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show; we also have a local base in Hannover.

We are an independent stand contractor, not an official supplier of Svenska Mässan or any organiser.

Sources

Frequently asked questions

The standard maximum is 2.5 m for structures and graphics. Taller structures must be notified to the adjacent stand and your event salesperson, and the venue's rules set a six-week deadline for structures above 2.5 m.
Yes, with written approval from the Swedish Exhibition & Congress Centre. Total construction height may not exceed 5 m, the lower level's free height is 2.3–2.5 m, the upper level may cover up to 50% of the lower floor space, and two-level stands must be at least 10 m apart.
Ceiling fittings may be loaded with a maximum of 50 kg, and wire positions have a fault margin of ±50 cm. Suspending wires may only be carried out by personnel or companies authorised by the venue.
No. Vehicles may not be driven into the halls, and all lifting and truck work must be provided by the Exhibition & Congress Centre. The exhibitor terms also list transport, lifting and forklift work among the services bought from the venue.
Stand walls and ceilings must be type-approved and not more flammable than wood. The halls are sprinkler-fitted, so ceiling textiles must be woven netting or sprinkler fabric, impregnated to fireproof level. Roofing over 30 m² needs consultation with the Fire Protection Officer.
Sweden is in the EU, and Türkiye and the EU are in a customs union for industrial goods, so stand materials made in Istanbul travel duty-free with an A.TR movement certificate. Exhibits you take back home can go on an ATA Carnet; consumables cannot.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request
Technical support

Global Exhibition Stand Design & Build Locations

We provide turnkey exhibition stand design, production, and installation services at major trade show venues worldwide. Explore our country and venue guides for your target destination.

CallWhatsAppGet Quote