Exhibition Stand Contractor Jönköping: Elmia Stand Rules

•By Exhibition Stand Pro Team

Short answer: Elmia in Jönköping has four exhibition halls with 34,000 m² of indoor space. Its published rules cap stands at 2.5 m unless Elmia AB grants an exemption, limit two-level structures to 50% of the stand area and 5 m total height, and reserve ceiling rigging for Elmia's own personnel. VAV Grup designs and builds custom stands for Elmia fairs from its production facility in İkitelli OSB, Istanbul.

Rules below come from Elmia’s exhibitor pages for individual fairs, so confirm them in the manual for your own event before you sign off a design.

Elmia at a glance

Item Elmia, Jönköping
Halls Four exhibition halls; Hall B is the largest
Indoor exhibition area 34,000 m²
Outdoor area 300,000 m² behind the halls, zones Field 200–Field 1000 (Rosenlund field)
Main entrances Two, including Lobby North (links to Halls A, B, Mässgatan and the Congress Centre)
Congress spaces Hammarskjöld Hall (almost 1,100 seats), Rydberg Hall (almost 300), about 20 smaller rooms
Address Elmiavägen 11, Jönköping, Sweden
Airport Jönköping Airport, about 15 km
Venue phone +46 36 15 20 00

Figures from Elmia’s fairground and facilities page and Fair-Point’s venue listing. Checked November 2026.

Elmia stand rules in one table

Topic Elmia’s rule
Standard maximum height 2.5 m for stands, signs and decoration
Height exemption Apply to Elmia AB no later than two months before the fair; extended display on max 50% of the stand area
Two-level area Max 50% of the stand area
Two-level position At least 3 m from the stand boundary; at least 10 m between two-level structures
Two-level heights Ground-floor ceiling 2.3–2.5 m; total stand height max 5 m
Stairs Walking distance max 10 m; upper area up to 25 m² needs a stairway at least 0.8 m wide; spiral stairway at least 0.9 m
Two-level cost Inspection fee, plus double stand rent on the two-level portion
Elmia stand walls White-painted particleboard, 22 mm thick, 1,005 mm wide, 2,500 mm high; 10 kg load per section
Floor May not be painted or damaged; only Elmia tape for carpet laying
Liability insurance Exhibitors and stand builders need valid cover for personal injury and property damage

Designing above 2.5 m: what to do first

The 2.5 m rule is the one that shapes a design most at Elmia, and the two-month deadline is earlier than many exhibitors expect. If your concept needs a tall tower, large hanging element or a second level, settle the structure first and file the application before detailed design. Elmia can refuse, so we show a fallback at 2.5 m in the same proposal.

A two-level stand needs more floor than it first appears. With a 3 m setback from the boundary and a 50% area limit, a small island leaves little usable upper deck, and the double rent applies to that portion. On stands under about 60 m², we usually compare the second level against a raised lounge or a tall graphic with an approved exemption before recommending it. That figure is our planning rule of thumb, not an Elmia rule.

Fire, rigging and electrics

  • Rigging: only Elmia personnel may suspend from or attach to the ceiling or roof. Elmia supplies 5, 6 and 8 mm wire, and wire rope clips must be clamp type and approved for lifting.
  • Fire class: walls and roofs need type-approved flame-retardant materials of at least class III. Textiles must be impregnated.
  • Closed stands: roofed or closed stands over 30 m² need fire alarms.
  • Hot work: not permitted without written permission, including during stand construction. The same goes for pyrotechnics and smoke machines.
  • Regulations: structures must meet the Swedish building and design regulations (BBR and BKR). Your stand builder holds workplace health and safety responsibility during construction.

Move-in and move-out

Construction may not begin before Elmia AB has given written permission. On the last move-in evening, work may continue until 20:00, and the hall must then be empty. Move-out cannot begin until aisle carpets are lifted, about one hour after closing.

Construction cards are valid only during move-in and move-out, and under-16s may not enter the halls in those periods, even with a parent. Saws, grinders and sanders need a chip or dust collector. Elmia does not pay for waiting time during move-in or move-out, so pre-assembly in the workshop matters here.

Fair calendar at Elmia

Fair Sector Dates Status
Elmia Subcontractor Supply industry 10–12 Nov 2026 Listed; 2027 dates to be confirmed
Elmia Park Green space maintenance 29 Sep – 1 Oct 2027 Listed
Elmia Garden Garden and plant trade Expected Sep 2027 Not confirmed
Elmia Husvagn Husbil Caravanning and camping Expected Sep 2027 Not confirmed
Elmia Nordic Rail Rail transport Expected Oct 2027 Not confirmed

Dates from TradeFairDates listings, checked November 2026. Always confirm on the organiser’s site before booking.

How we deliver a stand to Jönköping

  1. Brief and design: you send the event, hall, stand number, size and deadline. We reply with a first design and a project-specific quotation.
  2. Approval package: height exemption or two-level application, drawings and fire documents prepared for Elmia AB.
  3. Production: the stand is built and pre-assembled at our production facility in İkitelli OSB, Istanbul.
  4. Shipping: road freight to Sweden with an A.TR certificate for stand materials.
  5. Build-up and dismantling: our crew installs the stand in the organiser’s window and works with the services Elmia reserves for itself, such as rigging.
  6. After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show; we also have a local base in Hannover.

We are an independent stand contractor, not an official supplier of Elmia or any organiser.

Sources

Frequently asked questions

Elmia's published stand rules set a maximum height of 2.5 m for stands, signs and decoration. Elmia AB can grant an exemption; applications are due no later than two months before the fair, and extended display may cover no more than 50% of the stand area.
Yes, within limits. At most 50% of the stand area may hold a two-level structure, it must sit at least 3 m from the stand boundary and 10 m from another two-level structure, ground-floor ceiling height is 2.3–2.5 m and total height may not exceed 5 m. An inspection fee applies and double stand rent is charged on the two-level part.
Only Elmia personnel may suspend from or attach to the ceiling or roof structure. Any work that physically interferes with the building, including anchoring machinery to the floor, must be done by personnel designated by Elmia AB.
Stand walls and roofs need type-approved flame-retardant materials of at least class III, and decoration textiles must be impregnated to be difficult to ignite. Roofed or closed stands over 30 m² must have fire alarms. Hot work, pyrotechnics and smoke machines need written permission from Elmia AB.
Construction may not begin before Elmia AB gives written permission. Work can continue until 20:00 on the last move-in evening, after which the hall must be empty. Move-out starts only after the aisle carpets are removed, about one hour after closing.
Sweden is in the EU, and Türkiye and the EU are in a customs union for industrial goods, so stand materials made in Istanbul travel duty-free with an A.TR movement certificate. Exhibits you take back home can go on an ATA Carnet; consumables cannot.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request
Technical support