Short answer: Elmia in Jönköping has four exhibition halls with 34,000 m² of indoor space. Its published rules cap stands at 2.5 m unless Elmia AB grants an exemption, limit two-level structures to 50% of the stand area and 5 m total height, and reserve ceiling rigging for Elmia's own personnel. VAV Grup designs and builds custom stands for Elmia fairs from its production facility in İkitelli OSB, Istanbul.
Rules below come from Elmia’s exhibitor pages for individual fairs, so confirm them in the manual for your own event before you sign off a design.
Elmia at a glance
| Item | Elmia, Jönköping |
|---|---|
| Halls | Four exhibition halls; Hall B is the largest |
| Indoor exhibition area | 34,000 m² |
| Outdoor area | 300,000 m² behind the halls, zones Field 200–Field 1000 (Rosenlund field) |
| Main entrances | Two, including Lobby North (links to Halls A, B, Mässgatan and the Congress Centre) |
| Congress spaces | Hammarskjöld Hall (almost 1,100 seats), Rydberg Hall (almost 300), about 20 smaller rooms |
| Address | Elmiavägen 11, Jönköping, Sweden |
| Airport | Jönköping Airport, about 15 km |
| Venue phone | +46 36 15 20 00 |
Figures from Elmia’s fairground and facilities page and Fair-Point’s venue listing. Checked November 2026.
Elmia stand rules in one table
| Topic | Elmia’s rule |
|---|---|
| Standard maximum height | 2.5 m for stands, signs and decoration |
| Height exemption | Apply to Elmia AB no later than two months before the fair; extended display on max 50% of the stand area |
| Two-level area | Max 50% of the stand area |
| Two-level position | At least 3 m from the stand boundary; at least 10 m between two-level structures |
| Two-level heights | Ground-floor ceiling 2.3–2.5 m; total stand height max 5 m |
| Stairs | Walking distance max 10 m; upper area up to 25 m² needs a stairway at least 0.8 m wide; spiral stairway at least 0.9 m |
| Two-level cost | Inspection fee, plus double stand rent on the two-level portion |
| Elmia stand walls | White-painted particleboard, 22 mm thick, 1,005 mm wide, 2,500 mm high; 10 kg load per section |
| Floor | May not be painted or damaged; only Elmia tape for carpet laying |
| Liability insurance | Exhibitors and stand builders need valid cover for personal injury and property damage |
Designing above 2.5 m: what to do first
The 2.5 m rule is the one that shapes a design most at Elmia, and the two-month deadline is earlier than many exhibitors expect. If your concept needs a tall tower, large hanging element or a second level, settle the structure first and file the application before detailed design. Elmia can refuse, so we show a fallback at 2.5 m in the same proposal.
A two-level stand needs more floor than it first appears. With a 3 m setback from the boundary and a 50% area limit, a small island leaves little usable upper deck, and the double rent applies to that portion. On stands under about 60 m², we usually compare the second level against a raised lounge or a tall graphic with an approved exemption before recommending it. That figure is our planning rule of thumb, not an Elmia rule.
Fire, rigging and electrics
- Rigging: only Elmia personnel may suspend from or attach to the ceiling or roof. Elmia supplies 5, 6 and 8 mm wire, and wire rope clips must be clamp type and approved for lifting.
- Fire class: walls and roofs need type-approved flame-retardant materials of at least class III. Textiles must be impregnated.
- Closed stands: roofed or closed stands over 30 m² need fire alarms.
- Hot work: not permitted without written permission, including during stand construction. The same goes for pyrotechnics and smoke machines.
- Regulations: structures must meet the Swedish building and design regulations (BBR and BKR). Your stand builder holds workplace health and safety responsibility during construction.
Move-in and move-out
Construction may not begin before Elmia AB has given written permission. On the last move-in evening, work may continue until 20:00, and the hall must then be empty. Move-out cannot begin until aisle carpets are lifted, about one hour after closing.
Construction cards are valid only during move-in and move-out, and under-16s may not enter the halls in those periods, even with a parent. Saws, grinders and sanders need a chip or dust collector. Elmia does not pay for waiting time during move-in or move-out, so pre-assembly in the workshop matters here.
Fair calendar at Elmia
| Fair | Sector | Dates | Status |
|---|---|---|---|
| Elmia Subcontractor | Supply industry | 10–12 Nov 2026 | Listed; 2027 dates to be confirmed |
| Elmia Park | Green space maintenance | 29 Sep – 1 Oct 2027 | Listed |
| Elmia Garden | Garden and plant trade | Expected Sep 2027 | Not confirmed |
| Elmia Husvagn Husbil | Caravanning and camping | Expected Sep 2027 | Not confirmed |
| Elmia Nordic Rail | Rail transport | Expected Oct 2027 | Not confirmed |
Dates from TradeFairDates listings, checked November 2026. Always confirm on the organiser’s site before booking.
How we deliver a stand to Jönköping
- Brief and design: you send the event, hall, stand number, size and deadline. We reply with a first design and a project-specific quotation.
- Approval package: height exemption or two-level application, drawings and fire documents prepared for Elmia AB.
- Production: the stand is built and pre-assembled at our production facility in İkitelli OSB, Istanbul.
- Shipping: road freight to Sweden with an A.TR certificate for stand materials.
- Build-up and dismantling: our crew installs the stand in the organiser’s window and works with the services Elmia reserves for itself, such as rigging.
- After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show; we also have a local base in Hannover.
We are an independent stand contractor, not an official supplier of Elmia or any organiser.
Related pages
- Stand builders in Sweden: Gothenburg, Stockholm and Jönköping
- Svenska Mässan, Gothenburg: stand builder guide
- Double-deck exhibition stands: rules and planning
- Bella Center Copenhagen: stand builder guide
- How to choose an exhibition stand contractor
- Request a quote