Short answer: Exhibition Stand Pro (VAV Grup) designs and builds custom stands for Expomed Eurasia 2027, the Istanbul medical trade fair at Tüyap Fair and Congress Center, 15–18 April 2027, in its own production facility in İkitelli OSB, Istanbul. Send your hall and stand number and stand size on WhatsApp +90 532 457 67 78 or through the quote form and you receive a free first design and a project-specific quote within 48 hours.
Expomed Eurasia 2027 at a glance
| Item | Expomed Eurasia 2027 |
|---|---|
| Dates | 15–18 April 2027 (Thursday to Sunday) |
| Visitor hours | 10:00–18:00 on 15–17 April; 10:00–17:00 on 18 April |
| Venue | Tüyap Fair and Congress Center, Büyükçekmece, Istanbul |
| Organiser | Reed Tüyap Fairs Organization Inc., as named on Tüyap’s fair page |
| Product groups | Electro-medical equipment and medical and laboratory technologies; orthopaedics, physiotherapy and rehabilitation; consumables and commodities; hospital build and medical facility management; OTC products; plus the Expovet special section |
| 2026 results (organiser’s figures) | 527 exhibitors from 25 countries; 19,308 visitors from 134 countries |
| Build-up and dismantling | Not published online; set in the Participant Handbook on the MyTüyap exhibitor portal |
| Official site | expomedistanbul.com |
Dates and figures were checked on the organiser’s official pages on 29 October 2026. The organiser calls Expomed the region’s largest medical trade show; that is its own claim. Its pages give different edition numbers, so we quote none.
Who walks the aisles
The organiser lists company owners and general managers, purchasing managers of public and private hospitals, doctors, nurses, laboratory staff, pharmacists, dentists, distributors and Ministry of Health representatives. That means a two-minute product explanation at the aisle edge and a longer, quieter talk with a purchasing manager or distributor, so a medical stand needs an open demonstration front and a meeting area set back from the aisle.
What a medical stand has to do
- Look clean and stay clean. Smooth, wipeable surfaces in light colours read as hygienic and survive four days of handling. We avoid soft finishes that mark easily where visitors touch the stand.
- Run the device, not just show it. A device that operates needs sockets, cable routes and sometimes a data connection. We draw the power plan with the layout so the electrical order matches what you will switch on.
- Carry the heavy pieces. Imaging units, laboratory benches and hospital beds are heavy. Send weights early so plinths and frames are sized to them.
- Show a long product line without crowding. Consumables and OTC exhibitors have many small items; modular shelving, lockable storage and a counter keep samples within reach.
- Stage a real setting where it helps. Hospital build exhibitors often want a full-scale room set, such as a ward bay, so buyers see products in use.
Tüyap rules to design against
Tüyap’s exhibitor handbook, as quoted in our Türkiye guide, has an architect or interior architect approve stands up to 4.5 m; single-storey stands above 4.5 m, all two-storey stands and structures identified as a risk need a chartered civil engineer’s approval. The architectural project is uploaded to the MyTüyap portal in line with the fair’s timetable. Hanging parts or lighting from the hall ceiling or roof, drilling into floors or walls, and gypsum- or cement-derived boards or thinner-based paints are prohibited. That copy is undated, so the Expomed Participant Handbook decides.
Tüyap lists 14 halls in Büyükçekmece with 120,000 m² enclosed (62,000 m² net for fair set-up). Expomed’s floor plan is an image, so ask your sales contact which hall you are in before choosing a height.
Countdown to 15 April 2027
| Date | What happens |
|---|---|
| By Thu 24 Dec 2026 (16 weeks out) | You send hall, stand number, size, logo and product list; we return a design direction and quote within 48 hours |
| Thu 21 Jan 2027 (12 weeks) | Design frozen; drawings prepared for upload to MyTüyap, with engineer approval where the height or storeys require it |
| Thu 18 Feb (8 weeks) | Production in İkitelli: frame, walls, plinths, flooring, graphics |
| Thu 18 Mar (4 weeks) | Pre-assembly check, with devices placed and cable routes tested where possible |
| Thu 1 Apr (2 weeks) | Last changes agreed; handling requests sent through the organiser’s channel |
| Thu 8 Apr (1 week) | Loading plan fixed against the first allowed build-up day |
| Thu 15 Apr | Fair opens |
Build-up days come from the Participant Handbook, so the plan counts back from the first show day and slots the real dates in once you have them. SolarEX Istanbul (7 April) and Marble İzmir (13 April) open the same month; if you exhibit at more than one, say so in your first message.
Why a stand built in Istanbul suits Expomed
- No shipping and no customs. Tüyap is in Büyükçekmece and our factory is in İkitelli. The stand travels by road within one city.
- Finishing done before it arrives. Tüyap does not allow gypsum- or cement-derived boards or thinner-based paints in its halls, so panels leave the factory finished.
- A late change stays possible. If the device you bring changes, a plinth, a cut-out or a socket position can still be corrected in the workshop.
What to send for your free pre-design
- Hall and stand number, or the floor plan with your stand marked and the open sides shown
- Stand size in m²
- Logo as a vector file and brand colours
- Product list with dimensions, weights and power needs, and which devices must run
- Number of staff and meeting seats, and whether you want a closed room
- The Participant Handbook and other organiser documents, once you have them
Get your Expomed Eurasia 2027 quote: request a quote or WhatsApp +90 532 457 67 78.