Trade Show Booth Timeline: From Brief to Installation

By Alişan Çelik

A successful exhibition project requires structured timelines. Here is the ideal schedule:

  • Week 12-10 (Design & Briefing): Finalize marketing goals, space layout, and select your stand builder.
  • Week 10-8 (Approvals & Engineering): Submit structural designs and risk assessments (RAMS) to venue organizers.
  • Week 8-6 (Fabrication): Stand parts are manufactured at our Istanbul factory.
  • Week 6-4 (Logistics): Parts are packed into crates and shipped via sea/road freight.
  • Week 1 (On-site Build): The VAV crew constructs, paints, wires, and cleans the stand.
  • Day -1 (Handover): The client inspects the stand and places their products.

Frequently Asked Questions

What happens if we book our stand late?

We can execute express builds (within 3-5 weeks), but this may restrict design complexity and increase shipping fees due to air freight.

Ücretsiz 3D Tasarım AlınFast Reply

Bu kısa formu doldurun. 24 saat içinde sizinle iletişime geçeceğiz.

Project-led delivery
In-House Factory
Portfolio on request
Technical support

Global Fuar Stand Hizmet Bölgelerimiz

Dünyanın dört bir yanındaki fuar merkezlerinde anahtar teslim stand tasarım, üretim ve kurulum hizmetleri sunuyoruz. Hedef ülkenizdeki operasyonlarımız hakkında detaylı bilgi alın.

CallWhatsAppGet Quote