Stand Projesi İçin Teklif Al →

Exhibition Stand Builders Portugal: Exponor & FIL Rules

•By Exhibition Stand Pro Team

Short answer: Portugal's two main venues set very different limits. Exponor near Porto allows stands up to 6 m, with an approved project for anything over 4 m, while FIL in Lisbon has a general limit of 3 m and asks for a technical review for taller stands. Both require accredited contractors. VAV Grup designs and builds custom stands for both venues from its production facility in İkitelli OSB, Istanbul.

Rules below come from each venue’s general regulation. Each fair can add its own conditions, so confirm them in your fair’s manual. FIL’s PDF regulation is undated, and Exponor’s fair-specific addendum was not public when we checked.

Exponor and FIL side by side

Item Exponor (Porto) FIL (Lisbon)
Location Leça da Palmeira, Matosinhos Parque das Nações, Rua do Bojador
Total site 180,000 m² 100,000 m² multifunctional space
Covered space 45,000 m² Four pavilions of 10,000 m² each
Pavilions Six, from 2,052 to 7,920 m² Pavilion 1 (15 m ceiling); Pavilions 2–4 (12 m ceiling)
Floor capacity Not published 2,000 kg/m²
Maximum stand height 6 m General limit 3 m; taller after technical review
Second floor Prior authorisation; project 30 days ahead FIL’s express authorisation; extra cost
Rigging Exponor approval for every suspension FIL authorisation; request 20 calendar days ahead with load plan
Contractor accreditation Required before assembly Required before assembly
Liability cover EUR 500,000 minimum EUR 1,000,000 policy
Airport 10 minutes from Porto Airport (venue figure) Not published

Exponor stand rules

Topic Exponor’s rule
Height 2.5–4 m Brief description no later than 20 days before assembly
Height 4–6 m, or more than one floor Approved project no later than 30 days before assembly
Setback From 4 m high, step back 0.50 m on the fronts
Fire Floor coverings must be fire-retardant; carpet needs EU-approved fire-retardant certificates
Banned on site Cutting, welding, spray-painting and sanding machines
Lighting LED stand lighting
Electrical Responsibility statement for the stand’s installation
Machinery Your own forklifts or cranes are not allowed; Exponor’s exclusive supplier handles them
Loading Not inside pavilions, aisles or in front of outer gates
Stand ready Fully built 12 hours before opening
Overtime Request 48 hours in advance
Dismantling Not before official closing

Assembly companies pay an assembly fee set in each fair’s addendum. Organiser Exposalão’s document for its own Exponor fairs lists EUR 4.00 + VAT per m², paid at least 15 days before the event. Other organisers may differ. Work starts only with the legitimation letter, issued after full payment.

The ban on cutting and spray-painting makes pre-assembly in the workshop the practical route at Exponor. If you are planning a 4–6 m stand, work backwards from the 30-day date, as a changed drawing can use up that time quickly.

Press reports from October 2025 say the Exponor property portfolio is being marketed. We found no statement that this changes the fair calendar. Exponor still lists its 2027 fairs below.

FIL stand rules

Topic FIL’s rule
Height General limit 3 m; taller needs technical review at least 20 days before assembly
Second floor and decoration above 3 m Set back at least 1.50 m
Second floor FIL’s express authorisation, extra participation cost
Floor covering Fire-retardant carpet only, class M3
Suspension FIL authorisation; request 20 calendar days ahead with a load plan
Assembly credentials Assembly credential and cards required
Hours Set by FIL for each event; overtime needs written authorisation and a fee
Loading No stand materials in aisles aligned with exterior gates
Dismantling Not before official closing
Power 230/400 V, 50 Hz

The 3 m limit is the main design constraint in Lisbon. If your stand needs a tall tower or hanging sign, plan the technical review first and prepare a 3 m fallback in case it is refused. Pavilion ceilings of 12–15 m leave room, and FIL’s pavilions have a metal roof grid for suspensions.

Confirmed 2027 fairs

Fair Venue Sector Dates 2027
Lisbon Food Affair FIL Food, hospitality 15–17 Feb
inProjecta Exponor Not stated 18–20 Feb
BTL FIL Tourism 3–7 Mar
SagalExpo FIL Not stated 5–7 Apr
Tektónica FIL Construction 22–24 Apr
SIL FIL Real estate 22–24 Apr
Portugal Smart Cities Summit FIL Smart cities 4–6 May
EMAF Exponor Manufacturing industry 1–4 Jun
World of Coffee Lisbon FIL Coffee 17–19 Jun

Dates from FIL, Lisbon Venues and Exponor pages, checked November 2026. Exponor’s EMAF page also still shows older dates, so confirm with the organiser. Which pavilion each fair uses was not published.

How we deliver a stand to Portugal

  1. Brief and design: send the fair, pavilion, stand number and size. We reply with a first design and a project-specific quotation.
  2. Approval package: drawings, height file and accreditation documents prepared for the venue.
  3. Production: the stand is built and pre-assembled at our facility in İkitelli OSB, Istanbul, which fits both venues’ limits on on-site work.
  4. Shipping: freight to Portugal with an A.TR certificate for stand materials.
  5. Build-up and dismantling: our crew works in the fair’s window and uses the services each venue reserves for itself.
  6. After the show: reusable parts can be stored at our Düsseldorf warehouse for your next European show.

We are an independent stand contractor, not an official supplier of Exponor, FIL or any organiser.

Sources

Frequently asked questions

Exponor's general fair regulations allow a maximum stand height of 6 m. Stands from 2.5 m to 4 m need a brief description no later than 20 days before assembly. Stands from 4 m to 6 m, or with more than one floor, need an approved project no later than 30 days before assembly, and from 4 m the stand must step back 0.50 m on its fronts.
FIL's general regulation sets a general height of up to 3 m. Taller stands need a technical review at least 20 days before assembly, and a second floor needs FIL's express authorisation.
Yes, at both venues. Exponor requires hired companies to be accredited by Exponor or the promoter before assembly starts. FIL requires prior accreditation for assembly and decoration companies, plus a liability policy of EUR 1,000,000.
Exponor sets minimum liability cover of EUR 500,000 for exhibitors and for assembly companies, which also need work-accident insurance. FIL asks assembly companies for a EUR 1,000,000 civil and professional liability policy.
Plan to pre-assemble. FIL's English regulation page says on-site building of stands in the exhibition area is strictly forbidden, while its general regulation covers accredited assembly work. Ask FIL what is allowed for your fair; third-party work must be supervised by FIL's services.
Portugal is in the EU, and Türkiye and the EU are in a customs union for industrial goods, so stand materials made in Istanbul can travel with an A.TR movement certificate. Exhibits you take back home can use an ATA Carnet; consumables cannot.

Stand Projenizi BaşlatınProject Brief

Fuar, şehir ve stand ölçüsünü paylaşın; proje kapsamını birlikte netleştirelim.

Proje bazlı teslimat
Kendi Üretimimiz
Talep üzerine portföy
Teknik destek

Global Fuar Stand Hizmet Bölgelerimiz

Dünyanın dört bir yanındaki fuar merkezlerinde anahtar teslim stand tasarım, üretim ve kurulum hizmetleri sunuyoruz. Hedef ülkenizdeki operasyonlarımız hakkında detaylı bilgi alın.

AraWhatsAppTeklif Al